What counts as plumbing installation
- New bathrooms, half baths and basement bathrooms, including rough-in for the shower, toilet and sink.
- Kitchen remodels that move the sink, add a dishwasher or install a pot filler.
- Laundry rooms, utility sinks and washing machine boxes.
- Fixtures: toilets, faucets, sinks, tubs, showers and bidets. See toilet installation and faucet and sink work for details.
- Water heater connections and recirculation lines.
- Gas lines to ranges, dryers and fire features.
- Whole-house pressure reducing valves, shutoffs and hose bibs.
Rough-in: the part you cannot see
Rough-in is the pipe and venting installed before the walls and floors close. Drain lines need slope so waste flows, vents let air in so traps do not siphon, and supply lines need correct size so pressure holds at the farthest fixture. A mistake behind a wall costs a lot to fix, which is why the plan comes first and the inspection comes before drywall.
In a basement, the drain location is the big question. If the main drain is above the new fixture, you need a sewage ejector, and if it is below, gravity can do the work. We check the depth of the existing line before we draw the layout.
Basement bathrooms and finished basements
A basement bathroom needs a drain at the correct depth, a vent path and a water supply. If the floor must be cut to reach the drain, the concrete is broken, the line is installed and the slab is patched. A finished basement also adds the question of moisture, so see the basement waterproofing page if the space has ever been damp.
| Project | Key plumbing work | Common issue |
|---|---|---|
| Basement bathroom | Drain cut, vent, supply, ejector if needed | Drain depth and venting |
| Kitchen sink move | Relocate drain, vent and supply | Slope and cabinet space |
| New laundry | Washer box, drain standpipe, vent | Drain size and trap |
| Added shower | Valve, drain, pan, vent | Waterproofing and slope |
| Whole-house shutoff or PRV | Valve at the main, expansion tank | Access and pressure |
You are planning a bathroom, a basement finish or a fixture upgrade. Call and describe the layout.
Call (303) 552-3896Permits and inspections
Commerce City's list of permit items includes new plumbing fixtures and interior alterations including finished basements, and the city says the list is not exhaustive. In practice, a new bathroom or a basement finish needs a permit and inspections at rough-in and final. The Building Safety Division at 303-289-3790 can confirm for your project, and we coordinate the inspections when a permit applies.
Choosing materials
Most new supply lines are PEX, which is fast to install and handles freezing better than rigid pipe. Drain lines are usually ABS or PVC, and the city's amended code gives solvent cement and primer requirements for those joints. We use the right materials for each use and label them for the inspector.
Commerce City building notes
Commerce City has adopted the 2021 International Plumbing Code with local amendments, including a requirement that building sewers be installed not less than 12 inches below grade and that exterior water supply piping be not less than 42 inches below grade. For an addition or a detached structure, those depths set the trench plan, so we check them before quoting.
An unfinished basement with accessible rough-ins can reduce the cost of adding a bathroom compared with a finished one. Each house is different, so we look at the existing drain and the available access before promising anything.
What shapes the price
- Scope
- A single fixture swap costs less than a new bathroom.
- Drain depth
- A deep or distant drain adds cutting and trenching.
- Access
- Open framing is cheaper than finished walls.
- Fixtures supplied
- Fixture choice drives parts cost.
- Permit and inspection
- Fees and scheduling are part of the project.
Insurance note: new plumbing generally does not change your coverage, but unpermitted work can complicate a future claim or a sale. Keep permit records.
Want your real number? Call (303) 552-3896 and the price will be explained before work starts.
Sources and standards
Commerce City adopted the 2021 International Plumbing Code (IPC) with local amendments, and its Building Safety Division at 303-289-3790 answers permit questions. Check any plumber through the State Plumbing Board on the Colorado Division of Professions and Occupations site.
Common questions
Yes. We check the drain depth, vent path and supply lines, and add an ejector if the drain is too high.
Likely yes. The city lists new plumbing fixtures and finished basements among permit items. Confirm with the Building Safety Division at 303-289-3790.
We can install fixtures you provide or help you choose them. Supplying your own is fine as long as the model is compatible with the layout.
A basic rough-in often takes a few days. Slab cutting, ejector pits and inspections add time.
Yes. The new location needs drain slope, vent and supply, and the cabinet layout must allow access.
Yes. See gas line repair and installation for the safety steps and permit notes.
A good plan makes installation simple. Call to describe your project and get a price in Commerce City.
Call (303) 552-3896
